« Back to news story list

New Hotel – Dundee

Tuesday, May 16th, 2017

031

 

Skene Group Construction Services Ltd have successfully poured the floors within the redevelopment of one of the old mills in Dundee which is being transformed into a modern high spec hotel. Skene Group were appointed to carry out the installation of all internal drainage, service ducting and formwork to create the floors for the ground floor slab.  The works package also included forming new lift pits within the ground floor area of the proposed new hotel.  The works package was challenging in that the working room was restricted and proposed levels were varied.  The in house setting out engineers for the group ensured that the developer was given the floors to within tolerance and all at the correct structural slab level.  The developer has plans to further expand and continue with the renovation of the old mill undertaking to transform part of the mill into self-contained apartments.  Skene are negotiating currently to undertake the ground floor slabs, drainage etc.

« Back to news story list