118

 

The removal of the linkspan unit at Rosyth Port resulted in the Client requiring some surfacing works to be undertaken. Skene Group Ltd excavated the area using the stone from the Fife quarry unit. The in house fleet of 8 wheel tippers allowed for the materials to be delivered at the correct time intervals to allow the works to be completed on programme. Skene along with their tar works specialist concluded the works ahead of programme and allowed the ferry terminal to open without any interference to the operations and arrival of the ferry.