035

 

 

The building has now been landed on the foundations and the blockwork is progressing well.  Skene Group Ltd are currently installing the drainage onsite and forming car parking areas.  The internal floor slab is being made ready for receiving the concrete.  Skene Group Ltd are installing a sheet piling retention system to the embankments of the site prior to the Client having this clad.  The remaining retention systems shall be carried out by Skene Group Ltd by installing insitu concrete walls.   The site services are being installed by Skene Group Ltd along with the installation of the petrol interceptor and attenuation scheme.