« Back to news story list

Forth Ports — Grangemouth—Terminal Repairs

Tuesday, April 28th, 2015

192

 

 

 

The appointment of Skene Group Ltd to carry out the works at Grangemouth port has been a result of a relationship built on delivering a good honest trustworthy works package on time and within a budget. The current works package is to renew failed concrete running pavement within the container storage area. The installation of new drainage into existing drainage and ground preparation to receive the new reinforced concrete pavement is all being carried out by Skene Group ltd. The Skene concrete shall be delivered to site by Skene mixer truck, laid and finished by in house Skene operatives. All ensuring our Clients get the result they are looking for. The works shall be complete within a short programme to minimise disruption to the ports operations.

« Back to news story list